Sr. No. Contract No. Client Project Description Value Execution Period
SR (Millions) From To
1 2139 EMMAR INSTALLATION OF 110kV DOUBLE CIRCUIT OHTL AND U/G CABLE FROM 380/110 kV HHR-3 BSP TO 110/13.8 kV KAEC S/S 42.95 Nov/2013 Dec/2015
2 4000000655 &
4000000656
SEC-COA Construction of Nada & Al-Mubarkiyah 115/13.8kV S/S in Al-Hassa 168.4 Sep/2013 Sep/2015
3 4000001672 SEC – EOA 380kV OVERHEAD TRANSMISSION LINES BETWEEN #9027 S/S & #9023 S/S AND DIC-3 & AL-DHAHIYAH 112.9 Jul/2013 Oct/2015
4 4400000830 SEC – WOA 380kV OHTL ASSOCIATED WITH CONNECTION OF AL SALAM 380 kV BSP IN MADINAH 193.9 Mar/2013 Mar/2015
5 21101221/00
&
21202051/00
SEC – WOA Construction of 110kV Arfat-2 OHTL in Makkah & 110kV Wali Al-Ahd OHTL in Makkah 76.99 Nov/2012 May/2014
6 12-171-AL-102 Ma’aden Aluminium Company Ras Al-Khair, B10/B20 Substation Overhead Transmission Line Works 9.4 Oct/2012 May/2013
7 SEC – EOA
CEPCOIII
380kV OHL Modification at Ras Al-Khair Substation 11.6 Aug/2012 Dec/2013
8 21132064/00 SEC – WOA Maintenance Work of 380kV OHTLs IN WOA & NWOA 10 / Annum Jan/2012 Jan/2015
9 21131142/00
through
21131144/00
SEC – WOA 110kV Al-Jamoom-2, 110kV AL-Rabigh & 132kV Duba 219 Dec/2011 May/2014
10 31131121/00 SEC – EOA 380kV OHTL Work Associated with PP–11 (Phase – II) 234.38 Oct/2011 Apr/2014
11 31031138/00 SEC – EOA 380kV D/C OHTL from Qurayyat P/P to Future Tabarjal BSP 229.86 Jun/2011 Jan/2014
12 (CTW-400) SEC – COA
AL-AYUNI
Re-location of 132kV & 380kV Overhead Lines Crossing the proposed Railway Track. 16.3 Mar/2011 Oct/2013
13 41031044/00 SEC – SOA Najran East (Roikbah) 132 / 13.8 kV S/S (OHL Portion), Jizan Medical City 132/13.8 kV S/S (OHL Portion), Reconductoring Of Jizan Cps – Jizan Town And Bisha Cps – Bisha South 132 kV (OHL Portion) 64.5 Jan/2011 Mar/2014
14 (CTW-100) SEC – EOA
BIN LADEN
Re-location of 115kV & 230kV Overhead Lines Crossing the proposed Railway Track. 41.07 Jun/2010 Dec/2012
15 10931071/00 SEC-COA 380 kV Transmission Lines North Ring Riyadh City. 163 kM 241 Oct/2009 Dec/2013
16 34/1431/1430 Ministry of Water 132 kV & 33 kV OHTL for Najran Water Project 96 Oct/2009 Apr/2013
17 002-TX / MPE/ STEE/BID/2009 Ministry of Mines & Energy Republic of Chad MV & LV Distribution Networks 56 Oct/2009 Aug/2013
18 ENC 19/2006/2 Package 1 Electricity of Mozambique 110 kV Overhead Transmission Line 43 Jul/2009 Aug/2011
19 30832142/00 SEC (COA & EOA) Overhead Transmission Lines
110-380kV Diversions in COA & EOA (Unit Rate Contract-5 years duration)
20/ annum Jan/2009 Dec/2014
20 40831003/00 SEC(SOA), Abha Construction of 380kV D/C OHTLS between Shoaibah-2 P/P Namerah North 380/132kV BSP. 454.4 Feb/2008 Jul/2010
21 06-855-BX-083/00 Saudi Mining Company 380kV Transmission Line from Jubail 380/230kV S/S to Ma’aden 380kV S/S 243.7 Nov/2007 Oct/2009
22 MOE Secondary School (02 Nos.) – Const. EPC 12.25 107/2007 Jul/2009
23 10731005/00 SEC(COA), Riyadh 380kV Transmission Line Associated With The Integration of Power Plant 9 Expansion Project 145.3 Jun/2007 Apr/2012
24 MOE Secondary School (06 Nos.) – Precast Const. EPC 40.6 Jul/2006 Jul/2009
25 30631008/00 SEC(EOA), Dammam Construction of New 380kV OHTL to Connect New Dhahiyah BSP 380/115kV with Existing Ghunan S/S 71.5 May/2006 Jul/2009
26 21/1/21 SEC(WR), Jeddah Construction of 110kV OHL in Al Ays to Umlujj Line Length : 12 km 27 Apr/2004 Oct/2005
28 40221003/00 SEC(SRB) Diesel Generator 3 MW Power Station 9.5 Mar/2004 Oct/2005
29 RCLS-7092 Royal Commission Construction of a complete fuel station include Mosque, super market, workshop, restaurant & Hotel. 4.5 Mar/2004 Dec/2005
30 1005/23 Ministry of Municipality & Villages affairs Al Madinah Construction of a complete fuel station include Mosque, super market, workshop, restaurant & Hotel. 3.5 Feb/2004 Nov/2005
31 59/1/22 (Lot 2) SEC (WR), Jeddah Construction of 132kV OHL Tabook – Tayma Length : 251 km 71 Jul/2003 Mar/2005
32 01/06/2015 SEC (WR), Jeddah Installation works for village electrification including 33 / 13.8kV with Consumer Connections. 2.1 Jul/2001 Apr/2002
33 18/AA/02-KN/001/21 SEC (SRB) Tower Erection & Stringing Work 2 Jul/2001 Apr/2002
34 PIC-B-1155 Royal Commission Yanbu Industrial Civil Works Including drainage, yard piping, duct banks, steel structure 13.67 Feb/2201 Feb/2003
35 24 / 1 / 21 SEC (WR), Jeddah Emergency work with special arrangements 1.5 Feb/2001 Apr/2001
36 6 / 1 / 15 (Extension) SEC (WR), Jeddah Installation works for village electrification including 33 / 13.8kV with Consumer Connections. 1.4 Jan/2001 Jun/2001
37 E-00-319-51-0 KFIA, Dammam Foundation, piping, steel structure, metal deck, supply and installation. 25.46 Nov/2000 Jul/2002
38 72 / 1 / 20 SEC (WR), Jeddah Construction of 110kV OHL for Madinah Industrial City
Length : 14 km
12.9 Oct/2000 Jan/2002
39 SH-N/004/19 (Extension) SEC(South) Installation works for village electrification including 33 / 13.8kV with Consumer Connections. 2 Jul/2000 Jun/2001
40 SH-N/004/19 SEC(South) Installation works for village electrification including 33 / 13.8kV with Consumer Connections. 3 Jul/2000 Jun/1905
41 99 / 1 /16 SEC(WR), Jeddah Tower Erection Work
Line Length; 115km
8.5 Jul/2000 Oct/2001
42 RCLS-7021 Royal Commission Design & Construction (Turnkey) 11.5 May/2000 May/2002
43 18/AA/02-KN/001/19 SEC(SRB), Abha Tower Erection & Stringing Works
Line Length; 102km
3 Mar/2000 Aug/2000
44 4190123 Ministry of Municipality & Villages Al Madinah Building Area od 6000 m2 Turnkey Project 7.56 Jan/2000 Mar/2001
45 510 / 19 / 3 SEC(CRB), Riaydh Construction of 132kV OHL including telecom. Systems in Riyadh & Qaseem
Length : 210 km OHL.
153 Nov/1999 June\2008
Extended due to ROW
46 18/AA/02-KN/001/19 SEC(SRB), Abha Tower Erection & Stringing Works
Line Length; 49.2 km
1.9 Sep/1999 Feb/2000
47 18 / 1 / 17 SEC(WR), Jeddah Tower Erection Works
Line Length 380kV; 40km
Line Length 110kV; 25km
3 Jun/1999 Mar/2000
48 42/1/00/2/T Electricity Corporation Ministry of Industries & Electricity, Riyadh Turnkey Main Contract.
Complete Village Electrification Including Diesel Power Station alongwith 13.8kV Substation and Transmission / Distribution Networks in Kharkhair
39.46 Feb/1999 Jan/2001
49 74/1/18 SEC (WR), Jeddah Turnkey Main Contract for Construction of 380 kV OHL having 4-bundle Conductors per phase Line length; 7.5 km 24 Nov/1998 Nov-2000
50 98113/2/5/T Electricity Corporation Ministry of Industries & Electricity, Riyadh Turnkey Main Contract for Construction of Diesel Work Station. 60.58 Jun/1998 Dec-1999
51 SEC (CRB) Foundation of all types such as piles, pad and chimney, block and rock anchor 41.125 Dec/1997 Nov-1998
52 82 797 / 00 82 911 / 00 SEC (ERB), Dammam Turnkey Construction of 380 kV OHL 4-bundle Conductors per phase
Line length; 288.4 km
406 Jun/1997 Jul-1999
53 National Guard 11 Buildings – Total area 4800m2 with furniture and all facilities 11 Jan/1997 Jan-1998
54 Saudi Arabian Airlines Steel Structural building in King Abdulaziz Airport 8.75 Jan/1997 Jan-1998
55 515 / 13 / 3 SEC (CRB), Riyadh Installation of tower foundations, tower erection and stringing works. 4 bundle conductors
Line length; 40 km
25 Mar/1996 May-1997
56 PIC-G-9100 Royal Commission Building area 6000 m2 including furniture and all facilities 15 Jan/1996 Jan-1998
57 71 / 1 / 14 SEC (WR), Jeddah Turnkey Main Contract for supply & installation of Transformers 12.6 Aug/1995 Apr-1998
58 36 / 1 / 14 SEC (WR), Jeddah Turnkey Main Contract for supply & installation of Transformers 12.6 Nov/1996 Nov-1998
59 42/1/00/1/S Electricity Corporation Ministry of Industries & Electricity, Riyadh Turnkey Main Contractor. Including Diesel Power Station alongwith 13.8 kV Substation and Transmission / Distribution upto Customer Services including Civil & Building Works of the Power House and Residential camp in Kharkahir. 49.18 Aug/1995 May-2000
60 Prince Bandar Bin Mohm Bin Abdulaziz Saud Design and Construction 16.2 Jan/1995 Jan-1998
61 Prince Bandar Bin Mohm. Bin Abdulaziz Saud Design and Construction 11.2 Jan/1995 Jan-1998
62 Princess Al Bandary Bint Abdulaziz Saud Design and Construction including basement and landscaping works 45 Jan/1995 Jan-1998
63 Design and Construction 20 Jan/1995 Jan-1996
64 Electricity Corporation Ministry of Industries & Electricity, Riyadh Construction of civil works and installation of Electro Mechanical Equipment. 10.55 Jan/1995 Jan-1997
65 Royal Commission Design and Construction 8.6 Jan/1993 Jan-1994
66 SEC (WR), Jeddah Construction of civil works and installation of Electrical & Mechanical Equipment. 3.67 Nov/1992 Apr-1993
67 Royal Protocol, Riyadh Supply and installation works 25.72 Aug/1991 Dec-1992
68 Ministry of Electricity, Kuwait Rehabilitation works of 400kV OHTL’s 3.3 Mar/1991 Jun-1991
69 ENG / MAD- 1024 SEC (WR), Jeddah Construction of tower foundations and tower erections for 380kV Rabigh – Madinah OHTL
line Length; 290km
26.58 Jan/1991 May-1992